Project Overview

Shoreline Restoration Ltd. undertook concrete rehabilitation of the Gooseneck Lake Dam for the Ontario Ministry of Natural Resources. Work included engineered cofferdams and dewatering, concrete demolition and saw cutting and replacement of concrete spillway, installation of reinforcing steel and epoxy-grouted dowels, specialized drilling and installation of post-tensioned anchors, crack repairs, expansion joint sealing, and new galvanized handrails. The project required careful coordination of in-water construction, environmental protection.