Shoreline Restoration Ltd. completed surface rehabilitation of the Paudash Lake Dam for the Ontario Ministry of Natural Resources. The project included engineered cofferdams and dewatering, concrete demolition and concrete repairs, drilling into bedrock and post tension anchors install, crack injection crack sealing, concrete reprofiling, installation of post-tensioned rock anchors, rehabilitation of steel stoplog gains, new timber stoplogs, and rock protection. All work was performed with comprehensive environmental controls and fish protection measures.